• Home >
  • Back Issues >
  • Oil & Gas Journal >
  • Volume 118, Issue 3
  • Volume 118, Issue 3

    Mar. 2, 2020 | Spanning blocks 34/4 and 34/7 in the Tampen area of the Norwegian North Sea, Snorre field has been producing oil and gas since August 1992. Snorre development includes two platforms, A and B. Snorre A is an integrated production, drilling, and quarters (PDQ) unit. Oil and gas from Snorre A is piped to the nearby Statfjord A platform for final processing. Snorre field is operated by Equinor. Photo from Equinor.

    More content from Volume 118, Issue 3

    200302 Ogj029 T01
    IHS Markit indices are proprietary measures of cost changes similar in concept to the Consumer Price Index (CPI) and draw upon proprietary IHS Markit tools to provide a benchmark...
    March 2, 2020
    National policies to reduce greenhouse gas emissions and expedite the permitting of oil and gas transportation infrastructure have been recommended by the National Petroleum Council...
    March 2, 2020
    Royal Dutch Shell PLC subsidiary Equilon Enterprises LLC has completed the previously proposed sale of its 157,000-b/d dual-coking refinery and integrated logistics assets at ...
    March 2, 2020
    Total dry gas production in the US will continue to increase until 2050 in most forecast scenarios, mainly to support US natural gas exports to the global market, according to...
    March 2, 2020
    GASCO has let a contract to a consortium of Engineering Co. for Petroleum & Chemical Industries and Petroleum Projects & Technical Consultation Co. for the expansion of its Western...
    March 2, 2020
    An updated assessment estimates 3.6 billion bbl of oil and 8.9 tcf of natural gas are technically recoverable from Alaska’s Central North Slope.
    March 2, 2020
    India’s state-owned Bharat Petroleum has become India’s first exporter of very low-sulfur fuel oil that complies with the International Marine Organization’s new regulations requiring...
    March 2, 2020
    Talos Energy Inc. plans a 2020 capital expenditures budget of $520-$545 million, inclusive of plugging and abandonment.
    March 2, 2020
    200302 Og Jdss Z01
    Stephen Schubarth Schubarth Inc. & SSS LLC Houston Stephen Holditch Texas A&M College Station, Tex. Russell Chabaud SSS LLC HoustonReservoir and completion characterizations can...
    March 2, 2020
    200302 Og Jdal Z01
    Saudi Aramco confirmed that inlet distributor design on an existing low-pressure degassing tank (LPDT) was the root cause of poor water separation at its gas-oil separation plant...
    March 2, 2020
    200302 Og Jpli Z01
    US olefins producers made major progress in 2019 transitioning to a dual focus on domestic and international ethylene markets. At yearend 2016, US nameplate capacity was 64.3 ...
    March 2, 2020
    200302 Og Jtli Z01
    Energy Transfer LP’s plans to expand capacity of its 30-in. OD, 1,172-mile Dakota Access (DAPL) crude oil pipeline include new pump stations in Emmons County, ND, and Lincoln ...
    March 2, 2020