In addition to low-pressure gathering and transportation assets, OTP includes roughly 112 miles of 16-in. OD transmission pipeline spanning portions of the Texas counties of Reeves, Ward, Pecos, Crane, Upton, and Midland. It has two major interconnects, an active connection into Magellan’s Longhorn pipeline near Crane, Tex., and a future connection into Enterprise’s Midland terminal scheduled for completion in August.
OTP also includes three storage terminals near the Texas towns of Pecos, Crane, and Midland, with 150,000 bbl of leased or owned capacity currently in service. Oryx will expand the system’s storage capacity to more than 390,000 bbl with additional tankage in Reeves, Ward, and Crane counties.
The open season closes June 17.