ExxonMobil Corp. has let a 3-year hydraulic fracturing services agreement to ProPetro Holding Corp. to provide electric hydraulic fracturing services in the Permian basin.
The agreement includes deployment of two electric hydraulic fracturing fleets, wireline, and pumpdown services in first-half 2024 with an option for a third fleet with wireline and pumpdown services to commence operations in early 2025.
Alex Procyk is Upstream Editor at Oil & Gas Journal. He has also served as a principal technical professional at Halliburton and as a completion engineer at ConocoPhillips. He holds a BS in chemistry (1987) from Kent State University and a PhD in chemistry (1992) from Carnegie Mellon University. He is a member of the Society of Petroleum Engineers (SPE).