Exploration & Development

Photo from Vår Energi.
Jotun FPSO
Exploration & Development

Vår Energi begins tow-out of Jotun FPSO to North Sea Balder field

March 13, 2025
Production is expected to begin by the end of second-quarter 2025, with an expected 3-4 months ramp up period to peak production.

Latest Exploration & Development

More from Exploration & Development

Illustration from Var Energi.
Var Energi Goliat development illustration.
Discoveries

Galp discovers hydrocarbons in fifth Orange basin appraisal

Feb. 25, 2025
Preliminary data from the Mopane-3X well in Namibia’s Orange basin confirms oil and gas columns in stacked prospects.
Exploration & Development

bp signs agreement to develop Iraqi oil fields

Feb. 25, 2025
The agreement includes oil and gas production of more than 3 billion boe and Baba and Avanah domes of Kirkuk oil field and three adjacent fields, Bai Hassan, Jambur, and Khabbaz...
Area Drilling

Aker BP’s Norwegian Sea Bounty Updip prospect comes up dry

Feb. 21, 2025
Aker BP ASA drilled a dry well in the Bounty Updip prospect in the Norwegian Sea.
SPE
FIG 1. East Nesson WAG Pilot #2
Exploration & Development

Unconventional EOR shows uplift

Feb. 19, 2025
Enhanced oil recovery in unconventional reservoirs has been stymied by its low-permeability, low-porosity environment.
Discoveries

Petrobras discovers new oil accumulation at Búzios field

Feb. 17, 2025
The discovery is a new accumulation in a zone below the main reservoir, and reaffirms the pre salt potential of the oilfield, Petrobras said in a release Feb. 14.