ConocoPhillips and partners have started production from Jasmine gas and condensate field in the central North Sea offshore the UK (OGJ Online, Nov. 5, 2010).
The high-pressure, high-temperature field can produce 140,000 boe/d, the operator said. Water depth is about 85 m.
Development involves a 24-slot wellhead platform bridge-linked to an accommodation and utilities platform; a 16-in. multiphase pipeline bundle; and riser and processing platform bridge-linked to the existing Judy platform about 6 miles east of the field.
ConocoPhillips (36.5% interest), Eni (33%), and BG Group (30.5%) discovered Jasmine in 2006.