Lianzi development set offshore Congo (Brazzaville), Angola
Chevron Overseas Congo Ltd. will develop deepwater Lianzi oil field in the shared zone offshore Congo (Brazzaville) and Angola.
The company will install a subsea production system 65 miles offshore in 3,000 ft of water tied back to the Benguela Belize Lobito Tomboco (BBLT) platform in Angolan waters. Chevron says the 27-mile long electrically heated flowline will be the first of its kind installed in so much water.
It expects production to start in 2015 and reach a peak rate of 46,000 b/d.
Chevron and partners reported in 2004 that the Lianzi-1 exploration well encountered two oil-bearing reservoirs. A drillstem test of one interval flowed more than 5,000 b/d of 40° gravity oil through a 40/64-in. choke (OGJ Online, Oct. 12, 2004).
Chevron Overseas Congo operates Lianzi field with a 31.25% interest. Partners are Total, 36.75%; Eni and Songangol, 10% each; Republic of Congo National Oil Co., 7.5%; and GALP, 4.5%.
The BBLT platform is a compliant tower installed in 1,300 ft of water about on Angola Block 14 about 50 miles offshore handling production from Benguela, Belize, Lobito, and Tomboco oil fields (OGJ Online, June 27, 2006). Chevron subsidiary Cabinda Gulf Oil Co. Ltd. operates the project.
Bob Tippee | Editor
Bob Tippee has been chief editor of Oil & Gas Journal since January 1999 and a member of the Journal staff since October 1977. Before joining the magazine, he worked as a reporter at the Tulsa World and served for four years as an officer in the US Air Force. A native of St. Louis, he holds a degree in journalism from the University of Tulsa.