- Home
ConocoPhillips lets Eldfisk II modification contract
ConocoPhillips let a 1.3 billion kroner contract to Aker Solutions for modifying the existing Eldfisk 2/7 A, Eldfisk 2/7 FTP, Eldfisk 2/7 B, and Embla platforms, as a consequence of the planned installation in 2014 of the new Eldfisk 2/7 S platform.